NEWS on International Disruption (Verona-Bolzano Line) – ICM case | RFC ScanMed

July 26th 2021: On the Verona – Bolzano line the railway traffic is slowed down and the number of trains is reduced due to a breakdown in the circulation systems of the Verona Parona station, as a result of a fire in an electrical signal unit.

The number of freight trains will be reduced of 40%. Eurocity trains will be guaranteed with delays up to 30 minutes.

Long haul trains will be delayed and regional trains will be partially replaced with bus.